Transportation Alternatives - Summary of Project Funding

Transportation Alternatives - Summary of Project Funding

 

Click on the project description to view an image of the project.

Project Rank

Project Applicant

Project Location

Project Description

Construction Year

MPO Funding

Total Project Cost

2015 Application Cycle

(Funds available July 1, 2018)

1 City of Delray Beach Seacrest Boulevard from NE 22nd St. to Gulfstream Blvd. Reduce lane widths, widen sidewalks, add green bicycle lanes, brick crosswalks, and school zone lighting. FY 2019 $750,529 $1,703,601
2 Village of Tequesta U.S. 1 from Alt. A1A/Beach Rd. to County Line Rd. Convert 6 lanes without a bike lane to 4 lanes with buffered bicycle lanes, wider sidewalks, lighting, and signage. FY 2018 $589, 217 $3,749,000
3 Village of Wellington Binks Forest Dr. to Flying Cow Rd. Provide a shared-use bridge to connect to existing Flying Cow Multi -Use Pathway. FY 2019 $394,584 $548,919
4 Village of Royal Palm Beach Various locations within Palm Beach Colony and Counterpoint Estates neighborhoods Add ADA ramps and missing sidewalk connections.  FY 2019  $688,208 $839,028
5 City of Belle Glade Various locations around Gove and Belle Glade Elementary Schools Construct missing sidewalk links at various locations nearby. FY 2019 $618,735 $876,596
6 City of West Palm Beach Various locations near Palm Beach County Public Schools Construct ADA compliant ramps and sidewalks. FY 2019 $699,000 $878,650
 

2014 Application Cycle

(Funds available July 1, 2017)

1 City of Delray Beach Seacrest Boulevard from NE 13th St. to NE 22nd St. Reduce lane widths, widen sidewalks, add green bicycle lanes, brick crosswalks, and school zone lighting. FY 2018 $742,917 $1,628,846
2 Palm Beach County Lincoln Elementary School, West Riviera Elementary School, Roosevelt, Elementary School/ Roosevelt Middle School, and Palm Springs Middle School Install mast arm school zone flashers. FY 2018 $323,008 $481,430
3 City of Riviera Beach Avenue E between 12th Street and 24th Street in Downtown Riviera Beach Construct a bike lane, bio-swale and pedestrian pathway. Withdrawn by City $746,722 Not Applicable
4 City of West Palm Beach North Shore Neighborhood Add ADA compliant sidewalks, colored and textured crosswalks and flashing speed limit signs within the area. FY 2018 $490,096 $573,096
5 Village of Royal Palm Beach Okeechobee Blvd from Folsom Rd. to State Road 7 Installation of pedestrian-scaled lighting and roadway lighting and  6' wide sidewalk on the east side of Partridge Lane. FY 2018 $741,967 $1,542,249
 

2013 Application Cycle

(Funds available July 1, 2016)

1 City of Lake Worth 5th Avenue from A St. to F St. Construct a five-block span of a greenway. FY 2017 $749,240 $1,163,914
2 City of West Palm Beach Tamarind Avenue between Banyan Blvd and Palm Beach Lakes Blvd. Add landscaping, lighting and bicycle sharrows (shared bicycle lanes). FY 2017 $749,333 $958,465
3 City of Delray Beach  Seacrest Boulevard from George Bush Blvd. to NE 13th St. Reduce lane widths, widen sidewalks, add green bicycle lanes, brick crosswalks, and school zone lighting. FY 2017 $278,002 $733,218
 

2012 Application Cycle

(Funds available July 1, 2015)

1 Palm Beach County Office of Community Revitalization Everglades/E Main St to Canal Street Construct a pedestrian bridge over the L-10 canal. FY 2016 $639,860 $759,800
2 Village of Royal Palm Beach Sparrow Dr. between Sweet Bay Ln and Royal Palm Beach Blvd Construct a multi-use pedestrian bridge. FY 2016 $613,715 $734,000
3 City of Boca Raton Along W 4th Ave. and NW 12th Ave Add bicycle lanes and sidewalks (Tunison Palms Neighborhood). Withdrawn by City  $750,000  Not Applicable
4 City of West Palm Beach Fern Street from Rosemary Ave. to South Dixie Hwy Improve streetscape, add pedestrian amenities and bicycle racks. FY 2016 $749,952 $898,297
5 Village of Wellington Flying Cow Rd. from Binks Pointe to the Wellington Environmental Preserve Construct a 4-mile shared-use pathway. Construction Complete $744,461 $878,000
 

2011 Application Cycle

(Funds available July 1, 2014)

1 City of West Palm Beach 15th St, from Australian Ave to N. Dixie Hwy Add  bicycle lanes, street trees and complete crosswalk upgrades Construction Complete $749,925 $809,470
2 City of Delray Beach NE 2nd Ave from NE 4th Street to George Bush Boulevard Add green bicycle lane, street light, brick pavers and bio-swale. Construction Complete $616, 262 $945,666
3 Palm Beach County Environmental Resources Management Adjacent to the Beeline Hwy from PGA Blvd to Northlake Blvd. Construct paved 12' path (Bluegill Trail Phase 2). Construction Complete $750,000 $977,916
4 City of Boca Raton Adjacent to the Southeast corner of the Town Center Mall - from S. Verde Trail to S. of Town Center Rd. Add a 8' shared-use pathway (Patch Reef Trail). FY 2015 $352,000 $362,156
5 Village of Royal Palm Beach Crestwood Blvd N from Saratoga Blvd to Royal Palm Beach Blvd. Add on-street bicycle lanes, landscaping and install a school bus stop. Under Construction $284,100 $820,563
 

2010 Application Cycle

(Funds available July 1, 2013)

1 Palm Beach Environmental Resources Management Riverbend Park to the Cypress Creek Natural Area at the Palm Beach/Martin County line Construct a ten-foot wide paved bicycle and pedestrian path (Jessup Trail). Construction Complete $619, 407 $629,441
2 Palm Beach MPO Throughout Palm Beach County School District. Implement WalkSafeTM Pedestrian Education Program which will integrate pedestrian safety into elementary school curriculum. Ineligible $300,000 Not Applicable
3 Town of Jupiter A1A from Saturn Street to U.S. 1 Add bicycle lane, sidewalk, landscaping, and signage. Construction Complete $750,000 $7,825,116
4 City of West Palm Beach Tamarind Avenue between Palm Beach Lakes Boulevard and 25th Street Implement landscaping, pedestrian crossing improvements and street furniture. Construction Complete $749,999 $964,435